water test

英 [ˈwɔːtə(r) test] 美 [ˈwɔːtər test]

网络  水试; 水测试; 水质检验; 压水试验; 水试验

医学化学



双语例句

  1. To pass the water test the catalyst should not disintegrate or crumble.
    经过泡水试验,催化剂应不开裂或破碎。
  2. Extensive experiments of steam-water two-phase flow and boiling heat transfer in a vertical helically-coiled tube were carried out in high pressure water test loop of Xi an JiaotongUniversity.
    报导了在西安交通大学高压汽水实验回路上进行的垂直螺旋管内汽水两相流传热试验研究。
  3. Their progress was tracked by keeping food diaries and the doubly-labeled water test, which is the gold standard in measuring the rate of a person's metabolism or the amount of energy expended.
    此过程由写食物日志及水双标记检测跟踪,而水双标记检测是测量人体新陈代谢或能量消耗值的金标准。
  4. It is recommended that water test be performed prior to the dynamic drive.
    在这里推荐雨淋试验安排在动态试验之前进行。
  5. Sediment and water test Prediction Model for Soluble Solids Content of Apple& Based on Visible/ Near Infrared Spectroscopy Technology
    水和不溶物含量的测定苹果可溶性固形物含量的检测方法&基于可见光近红外光谱技术
  6. The development situation of the software for water balance test in thermal power plant is introduced.
    介绍了火力发电厂水平衡测试软件的研制情况。
  7. About a week after the water test, the mice were killed and the researchers examined their brains, counting the numbers of new neurons.
    水中试验后一周左右,老鼠被杀死。研究人员研究其大脑,计算了新的神经元细胞。
  8. The water test and microscopic identification are used to distinguish pure and doped counterfeit goods to en-sure the safe and effective clinical use.
    为了区别松花粉纯品与掺伪品,采用性状、水试、显微等鉴定方法加以鉴别,以保证临床使用安全、有效。
  9. To renew defective rivets and conduct water test in following places.
    更换下列各处损坏的柳钉并做水压试验。
  10. YFT-T series has low and high pressure water pump, so you can have the water test directness.
    系列已配置高、低压水泵及供压系统,可直接进行水压试验。
  11. Basic environmental test procedures for electric and electronic products-Test R: Water test method
    GB/T2423.38-1990电工电子产品基本环境试验规程试验R:水试验方法
  12. Experimental research into coagulation effect of PAM in recycling filter backwash water Test and Analysis on Turbidity Degree of Backwash Water to Filtering Media during the Plain Sedimentation and Coagulation Sedimentation
    PAM在滤池反冲洗水回用中混凝效果的试验研究
  13. At the same time he made an effort to displace the big iron-shod shoe which rested on his treasure. To renew defective rivets and conduct water test in following places.
    同时使劲推开那只压在他宝贝上面的铁钉鞋。更换下列各处损坏的柳钉并做水压试验。
  14. Controlling arsenic recreational water test and analysis of recreational water condition
    防砷改水试验与改水条件分析
  15. At present there have four test methods in common use: the belt wicking test method, the dropping liquid test method, the weighing test method and the holding water test method.
    目前常用的织物导湿性能的测试方法有四类条带芯吸法、滴液法、称重法和保水率法。
  16. By analyzing outcome of the surround well pumping water test after the dam was disposed, the pervasion coefficient can meet preventing pervasion purpose;
    并对处理后的坝体进行现场围井抽水试验,得出防渗墙的渗透系数满足防渗效果;
  17. Secondly, lift the pontoon roof with jacks, and repair the tank bottom, and next carry out a water test until qualification, in final reinstall the accessories of tank, by which a predicted result in inclination correction has been received.
    再用千斤顶顶起浮盘,修补罐底,然后试水,合格后恢复油罐附件,纠斜收到了预期效果。
  18. Open water test of performance of Becker flap-rudder
    连杆襟翼舵敞水试验研究
  19. Correlation analytical method used in pumping water test data analyzing
    相关分析法在抽水试验数据分析中的应用
  20. The clinical trial showed Eosin-Y water test is an effective method for evaluating the male fertility.
    这表明,伊红Y水试验法是评价男性生育能力的有效方法。
  21. The traditional appraisal methods: water test and repellent t'est are forthright and efficacious.
    传统的水试法和驱尘试验对熊胆真伪鉴定简捷有效。
  22. : By means of natural, coagulative and sand peak coagulative settling test, the flowing water test of high, sub, and low turbidity water containing most of coarse silt have been research. Some results are concluded.
    通过自然沉淀、混凝和沙峰型混凝沉淀试验,对以粗组分泥沙为主的高浊度水和低浊度水进行了动水试验研究,取得一些成果。
  23. Because of the shortages of the existing measures to penetration coefficient, this paper brings forward a combined method of simply pumping water test and simply pouring water test in a project.
    针对现有测定渗透系数(K值)方法的不足,结合工程实例,提出了一种简易抽水与简易注水结合的实验方法,以测定K值。
  24. Thermographic analysis on distribution of hand skin temperature among workers exposed to vibration and the effect of cold water test
    手传振动作业工人手部温度分布的红外图像分析及其冷水负荷试验的影响
  25. Evaluation of The Human Capacitated Sperm membrane Integrity Using ″ Water Test ″ Method
    水试验评价人类获能精子膜完整性的研究
  26. Construction Method for Controlled Water Test to Preload Large Oil Tank Subgrade
    大型油罐地基充水预压工法简介
  27. From design, construction, pipe installation and other aspects reasons caused the leakage of toilet are analyzed; at the same time corresponding prevention and treatment measures are proposed. Storing water test is made to evaluate the treatment effect of waterproof coating to ensure waterproofing construction quality.
    从设计、土建施工、管器安装等方面分析了卫生间出现渗漏的原因,并提出了相应的渗漏预防措施,并对防水涂层的施工效果进行了蓄水试验,以保证卫生间的防水施工质量。
  28. [ Methods] To measure the hand skin temperature of VWF patients, workers exposed to vibration and controls before and after cold water test.
    [方法]对白指病人、接振工人及对照工人进行冷水试验检查,用热电偶温度计测量冷试前后手部皮肤温度。
  29. Water Proof Concrete Construction and Full Water Test of Super-large Water Tanks
    超大型水池防水砼施工及满水试验